Built on a Solid Foundation
Service
Moisture mitigation protects new flooring from moisture vapor moving up through a concrete slab, which is a leading cause of adhesive failure, bubbling and lifted coatings. Core Floorings Inc installs moisture mitigation systems on commercial and industrial projects in Chicagoland and Northwest Indiana, and the work starts with testing the slab, not guessing.
The accepted way is to measure the slab with a standardized test, not a handheld meter. ASTM F2170 uses relative humidity probes set into drilled holes, typically 20 or 40 percent of the slab depth, sealed and read after about 72 hours. ASTM F1869 measures the rate of vapor leaving the surface, but it only reflects the top of the slab.
Many flooring manufacturers set their own limit, and 75 percent relative humidity or lower is a commonly cited target. Always follow the limit in your flooring manufacturer's data sheet. Handheld meters are covered by ASTM F2659, which says they should not be the basis for accepting a slab for moisture-sensitive flooring.
Core Floorings Inc performs moisture testing with our own crews and also works with third-party testing firms, depending on the jobsite and the project specification.
| Test | What it measures | Notes |
|---|---|---|
| ASTM F2170 | Relative humidity inside the slab | Probes at 20% or 40% of depth, read after about 72 hours |
| ASTM F1869 | Moisture vapor emission rate at the surface | Reflects only the top portion of the slab |
| ASTM F2659 | Handheld meter screening | Not for acceptance of moisture-sensitive flooring |
Moisture vapor attacks the bond between the slab and the flooring. Typical symptoms are adhesive breakdown, bubbling, cupping, gaps between planks or tiles, lifted coatings and mold. They can show up within days or weeks of installation, after the finished floor is already paid for.
A mitigation system is needed when test results exceed the limit set by the flooring or coating manufacturer. We install a vapor-reducing system on the prepared slab, then the project continues with leveling, a skim coat or the finished floor. Because the sequence matters, mitigation is often followed by our floor leveling work or a coating system.
For general contractors and design teams, the most protective step is naming the test method, such as ASTM F2170, in the project specification so the testing standard and acceptance limit are not left open.
Moisture is measured with an accepted standard, and readings are compared to the flooring manufacturer's limit.
If the readings exceed the limit, we recommend a system matched to the readings and the finish flooring.
The surface is ground and cleaned so the mitigation system can bond.
The vapor mitigation product is applied at the thickness the manufacturer requires.
Leveling, skim coat or the finish flooring follows once the system has cured.
Every floor is different, so we price each project from the site, the slab and the spec. These are the factors that move the number. Send us your project for an itemized bid.
Last updated:
Request a Bid
Send us your drawings, square footage and schedule. We will walk the site, test the slab and get you a clear, itemized bid.