Floor leveling corrects the high and low spots in a concrete slab so the surface meets the flatness your finished floor requires. Core Floorings Inc installs self-leveling underlayments and cementitious toppings on commercial and industrial projects in Chicagoland and Northwest Indiana, so tile, resilient flooring, carpet and coatings go down on a floor that is ready for them.
A slab needs leveling when its flatness falls short of what the finish flooring or the project specification requires. Flatness is measured with FF (flatness) and FL (levelness) numbers under ASTM E1155, and ACI 117 sets the tolerance classes a slab is expected to meet. Higher FF numbers mean a flatter floor, and a typical commercial office slab may only be specified at a modest number.
One trade article argues that an underlayment can reach a higher degree of flatness at lower cost than building the slab itself to a very high FF. Our team reviews the flatness spec early, so the leveling plan matches what your finish flooring manufacturer actually requires.
Use a self-leveling underlayment to correct real height differences and a skim coat to smooth minor surface defects. Many projects call for both, with the underlayment first. Our skim coat service covers the thin, finishing layer.
| Factor | Self-leveling underlayment | Skim coat |
|---|---|---|
| Best for | Correcting height differences and out-of-tolerance flatness | Shallow defects, rough or patched surfaces, minor smoothing |
| Typical depth | Roughly 1/8 inch to 1 inch or more, within each product's limit | Thin layers |
| Primer | Required by nearly every product | Per manufacturer data sheet |
| How it is placed | Flows out to find level | Troweled or squeegeed thin |
We install cementitious self-leveling underlayments and toppings designed for commercial traffic. Every product has its own minimum and maximum thickness, so we select the material for the depth your slab actually needs and follow the manufacturer's primer and curing requirements. Our main underlayment lines are Maxxon and Ardex, and we use other manufacturers when the project spec calls for them.
Where a slab has high spots, concrete grinding and surface preparation come first. If moisture readings are high, we test and address them before any flooring or underlayment goes down, using our moisture mitigation systems.
We review the flatness spec, check slab condition and moisture, and identify high and low areas.
Grinding, cleaning and crack or joint repair give the underlayment a sound surface to bond to.
A primer matched to the underlayment helps it bond and perform as designed.
The material is mixed and placed to the planned depth and flows out to level.
We allow the manufacturer's cure time, then confirm the floor is ready for the next system.
Every floor is different, so we price each project from the site, the slab and the spec. These are the factors that move the number. Send us your project for an itemized bid.
Last updated:
Request a Bid
Send us your drawings, square footage and schedule. We will walk the site, test the slab and get you a clear, itemized bid.
Have these ready and we can turn your bid around faster.
Email plans to sales@corefloorings.com